U shape auto duct line 5Mini auto duct line 5Auto duct line 5Auto duct line 3Auto duct line 2Duct Line 5 U shapeDuct Line 5Duct line 3Duct line 2Auto coil LineSpiral tubeformer PD1602 +plasma cutSpiral tubeformer PD1602Spiral tubeformer PD-1500Mold type spiral tubeformerFlexible spiral duct making machineFlat oval duct making machinehydraulic elbow makerElectric elbow maker machineDuct elbow makerSpot welderRound flange forming machineRotary beading machine3 roller rolling machineAngle iron bending machineCNC plasma cutting machineDuplex TDF flange former T-16-2 with cleatDuplex TDF flange former T-16-2 without cleatTDF flange forming machine T12TDF flange forming machine T15TDF flange forming machine T16TDF flange forming machinePittsburgh lock forming machine SA-12HBPittsburgh lock forming machine SA-15HBS&C cleat lock forming machine SA-12SRound duct lock forming machine SA-12CLock forming machineManual folding machine 1300mm to 2500mmManual TDF folding machine 1300-2500mmPneumatic TDF folding machine 1300Electric duct folding machineAmerican standard folding machineCNC hydraulic Press BrakeDuct folding/bending machineHand held seam lockerPneumatic seam lockerHydraulic seam lockerPittsburgh seam lockerTDC flange machine with grooveTDC flange forming machine without grooveTDC flange machinePower Fastener for TDC fasteningDuct beader 1300mmDuct beader 2000mmDuct beading machinePower slitting machineAutomatic TDF corner making lineManual TDF corner lineTDF corner moldTDC corner moldG clamp moldTDF/C G Clamp Corner punching machinePneumatic TDF corner maticsPortable hydraulic TDF corner maticsTDF corner maticsElectric shearing machineHydraulic guillotineShearing machineElectric angle iron bening machineHydraulic angle iron bending machineAngle iron flange forming machineCNC plasma cutting machineCleat benderTDF flange formerPittsburgh lock formerTDF folding machinePortable seam lockerDuct beaderRotary beader crimperBeader and SlitterDuct MachineAuto Duct production linesU Shape Auto Duct Line 5Linear Shape Auto Duct Line 5Auto Duct Production Line 3Auto Duct Production Line 2Mold type spiral tube former machineCNC Plasma Cutting MachineCNC Angle Iron Production LineAuto hydraulic gorelocker machineElectric gore locker machineHydraulic OvalizerSheet metal edge hemming machineFatory videosMessagesNews

Super Auto Duct Line 5 - Factory Setup and Layout Design

  1
Author:Jason WangSource:Preda Machine

Super Auto Duct Line 5 - Factory Setup and Layout Design


Welcome to our comprehensive guide on the Super Auto Duct Line 5. Whether you are setting up a new HVAC duct fabrication shop or upgrading your existing production line, this guide will provide you with all the information you need to make an informed decision.

The Super Auto Duct Line 5 represents one of the most important investments you can make in your HVAC fabrication business.


Product Overview


Key Features and Advantages

The Super Auto Duct Line 5 stands out due to several key features:

High precision roll forming with alloy steel rollers for consistent quality.

Automatic decoiler handling up to 5 ton coils, reducing manual labor.

User-friendly PLC touch screen control system for easy operation.

Integrated TDF flange forming station for efficient production.

Automatic flying cutter for accurate length cutting.


Technical Specifications


Parameter
Value
Product Model
Super Auto Duct Line 5
Duct Type
Rectangular
Material Thickness
0.4 - 1.2 mm GI
Max Duct Width
1500 mm
Production Speed
8 - 20 m/min
Installed Power
15 - 25 kW
Machine Weight
8 - 15 tons
Warranty
2 years



Production Process

The production process follows these steps:

Step 1: Load the galvanized steel coil onto the decoiler.

Step 2: Leveling and feeding material into the line.

Step 3: Notching and punching station creates cutouts.

Step 4: Roll forming creates Pittsburgh seam and TDF flange.

Step 5: Folding and bending into rectangular duct shape.

Step 6: Flying cutter cuts to specified length.

Step 7: Finished ducts are automatically stacked.


Maintenance Schedule


Task
Frequency
Check oil levels
Daily
Clean filters
Weekly
Lubricate parts
Monthly
Check hydraulics
Monthly
Calibrate sensors
Quarterly
Replace oil
Annually



Common Problems and Solutions


Problem
Solution
Duct dimensions inconsistent
Check guiding system
Poor seam quality
Inspect and adjust rollers
Cutting not square
Recalibrate cutter
Motor overheating
Reduce speed
PLC alarms
Check sensor connections



ROI Analysis

Compared to manual production, an auto duct line can reduce labor requirements by 60-70 percent and increase production speed by 300-500 percent. The payback period is typically 12-24 months.


Conclusion

The Super Auto Duct Line 5 is a reliable investment that can transform your HVAC fabrication business. Contact our engineering team for a customized quote.